CCNBac Ninh
DOAN BAI INDUSTRIAL CLUSTER - BAC NINH

1 photos
Key facts
- Total area
- 70 ha
- Rent
- 100*
- Occupancy
- Not updated
- Year established
- 2018
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
DOAN BAI INDUSTRIAL CLUSTER - BAC NINH
Address: Hiep Hoa District, Bac Ninh Province
Operating Time: 2018 - 2068
Total Area: 70 ha
Land Rent Price: 100 USD/m²/lease cycle

Overall Map of Doan Bai Industrial Cluster
Strategic Position and Regional Connectivity
Doan Bai Industrial Cluster is located at a crucial intersection in the North, with convenient transportation that connects the economic triangle of Hanoi - Hai Phong - Quang Ninh and the Nanning - Lang Son - Hanoi - Hai Phong economic corridor via road, rail, water, and air routes. Specifically:
l Approximately 38 km from Noi Bai International Airport;
l Adjacent to Doan Bai - Luong Phong 1 Industrial Cluster;
l Approximately 155 km from Huu Nghi International Border Gate;
l Approximately 22 km from Yen Phong Industrial Zone;
l Approximately 160 km from Hai Phong Port;
l Approximately 35 km from Que Vo Industrial Zone;
l Approximately 60 km from Hanoi City Center.
Investment Attraction Sectors at Doan Bai Industrial Cluster
l Mechanical engineering industries;
l Electrical equipment manufacturing;
l Electronics production and assembly;
l High-tech product manufacturing;
l Garment industry;
l Machinery and construction equipment production;
l Agricultural and forestry product processing;
l Medical equipment manufacturing;
l Supporting industries;
l Other light, non-polluting industries.

Regional Connectivity Map of Doan Bai Industrial Cluster
Infrastructure at Doan Bai Industrial Cluster
Electricity Supply System
The electricity supply for the Industrial Cluster is sourced from the national grid through the 110/22KV substation with a capacity of 4x63 MVA.
Water Supply System
The water supply plant has a capacity of up to 30,000 m³/day.
Wastewater Treatment System
The wastewater treatment plant has a total capacity of 7,500 m³/day.
Traffic System
l The main road is National Highway 37, with a width of 28m.
l Branch roads are between 20m and 27m wide.
Investment Incentives at Doan Bai Industrial Cluster
l 7 years of land tax exemption.
l 2 years of corporate income tax (CIT) exemption, followed by a 50% reduction for the next 4 years.
l CIT rate of 17% for 10 years.
Land Rent and Other Costs at Doan Bai Industrial Cluster
Land rent with infrastructure: 100 USD/m²/lease cycle
Land tax: Paid annually according to state regulations
Management fee: 7,000 VND/m²/year
Wastewater treatment fee: 14,000 VND/m³
Water price: 14,000 VND/m³
Electricity price: According to EVN pricing
The above unit prices and fees do not include VAT and may change; please contact IIP for the latest information.
Contact Information:
Partners interested in leasing land to set up factories at Doan Bai Industrial Cluster, please contact the hotline: 1900.888.858 or email: [email protected].
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
21.3138, 106.0268
Videos of this park
This park has no videos yet