KCNHai Phong City

DO SON INDUSTRIAL PARK - HAI PHONG

1 photos

Key facts

Total area
150 ha
Rent
130*
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

DO SON INDUSTRIAL PARK - HAI PHONG
Address: Ngoc Xuyen Ward, Do Son District, Hai Phong City
Operation period: 2006 - 2056
Total area: 150 ha
Land rental price: 130 USD/m² (excluding VAT)

Strategic Location & Regional Connectivity

  • About 190 km from Mong Cai Border Gate
  • About 230 km from Huu Nghi Border Gate
  • About 120 km from Hanoi city center
  • About 17 km from Hai Phong Container Port
  • About 12 km from Hai Phong Airport
  • About 16 km from Hai Phong city center
  • About 14 km from Hai Phong Railway Station

Infrastructure of Do Son Industrial Park

Power Supply System

The industrial park is provided with two independent power sources from the city to the industrial park’s power station. From there, electricity is supplied via a 22kV high-voltage line to the substations of enterprises within the park.

Water Supply System

Capacity of 10,000 m³/day-night.

Wastewater Treatment System

The wastewater treatment plant uses advanced physico-chemical and biological technology, with a processing capacity of 1,200 m³/day.

Internal Road System

The internal road network is paved with concrete asphalt, meeting Vietnam’s H30 road standards.

  • Main road width: 34m
  • Secondary road width: 21.5m

Investment Sectors in Do Son Industrial Park

  • Clean industries, medium and small-scale mechanical engineering
  • Metal fabrication and manufacturing
  • Production and assembly of electrical and electronic equipment, electronic components, and automobile parts
  • Agricultural, food, and seafood processing
  • Beverage production
  • Manufacturing of furniture, bamboo and rattan products, and non-metallic goods
  • Textile and garment industry
  • Footwear manufacturing

Investment Incentives at Do Son Industrial Park

Corporate income tax exemption for the first 2 years and a 50% reduction for the following 4 years.

Land Rental & Other Fees at Do Son Industrial Park

  • Land rental (with infrastructure): 130 USD/m² (excluding VAT)
  • Infrastructure management fee: 0.5 USD/m²/year (excluding VAT)
  • Clean water price: 18,000 VND/m³
  • Wastewater treatment fee: 0.4 USD/m³
  • Electricity price: According to EVN’s pricing

Contact:

For land leasing inquiries and setting up manufacturing facilities at Do Son Industrial Park, Hai Phong, please contact:
Hotline: 1900.888.858
Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

20.7405, 106.7624

Videos of this park

Empty

This park has no videos yet

?