DO SON INDUSTRIAL PARK - HAI PHONG

1 photos
Key facts
- Total area
- 150 ha
- Rent
- 130*
- Occupancy
- Not updated
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
DO SON INDUSTRIAL PARK - HAI PHONG
Address: Ngoc Xuyen Ward, Do Son District, Hai Phong City
Operation period: 2006 - 2056
Total area: 150 ha
Land rental price: 130 USD/m² (excluding VAT)
Strategic Location & Regional Connectivity
- About 190 km from Mong Cai Border Gate
- About 230 km from Huu Nghi Border Gate
- About 120 km from Hanoi city center
- About 17 km from Hai Phong Container Port
- About 12 km from Hai Phong Airport
- About 16 km from Hai Phong city center
- About 14 km from Hai Phong Railway Station
Infrastructure of Do Son Industrial Park
Power Supply System
The industrial park is provided with two independent power sources from the city to the industrial park’s power station. From there, electricity is supplied via a 22kV high-voltage line to the substations of enterprises within the park.
Water Supply System
Capacity of 10,000 m³/day-night.
Wastewater Treatment System
The wastewater treatment plant uses advanced physico-chemical and biological technology, with a processing capacity of 1,200 m³/day.
Internal Road System
The internal road network is paved with concrete asphalt, meeting Vietnam’s H30 road standards.
- Main road width: 34m
- Secondary road width: 21.5m
Investment Sectors in Do Son Industrial Park
- Clean industries, medium and small-scale mechanical engineering
- Metal fabrication and manufacturing
- Production and assembly of electrical and electronic equipment, electronic components, and automobile parts
- Agricultural, food, and seafood processing
- Beverage production
- Manufacturing of furniture, bamboo and rattan products, and non-metallic goods
- Textile and garment industry
- Footwear manufacturing
Investment Incentives at Do Son Industrial Park
Corporate income tax exemption for the first 2 years and a 50% reduction for the following 4 years.
Land Rental & Other Fees at Do Son Industrial Park
- Land rental (with infrastructure): 130 USD/m² (excluding VAT)
- Infrastructure management fee: 0.5 USD/m²/year (excluding VAT)
- Clean water price: 18,000 VND/m³
- Wastewater treatment fee: 0.4 USD/m³
- Electricity price: According to EVN’s pricing
Contact:
For land leasing inquiries and setting up manufacturing facilities at Do Son Industrial Park, Hai Phong, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
20.7405, 106.7624
Videos of this park
This park has no videos yet