KCNDong Nai

DAU GIAY INDUSTRIAL PARK – DONG NAI

1 photos

Key facts

Total area
329 ha
Rent
160*
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

DAU GIAY INDUSTRIAL PARK – DONG NAI
Address: Dau Giay Commune, Dong Nai Province
Operation Period: 2008 – 2058
Total Area: 329 ha
Land Lease Price: 160 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • About 2 km from National Highway 1;
  • About 26 km from Long Thanh International Airport;
  • About 35 km from Dong Nai Port;
  • About 60 km from Cat Lai Port.

Infrastructure of Dau Giay Industrial Park
Power Supply System
The 110KV Dau Giay power station supplies electricity from the 500KV North-South transmission line, with a capacity of 63MW, and a 22KV power grid serving the entire industrial park.

Water Supply System
Stable water supply for tenants, with 10,000 m³/day from Gia Tan Water Plant, along with a 300 m³ water tower and a 2,000 m³ reservoir located within the park.

Wastewater Treatment System
Phase 1 treatment plant with a capacity of 2,000 m³/day. Upon completion, the total capacity for all phases will reach 8,000 m³/day. Discharge standards meet Grade A of QCVN 40:2011/BTNMT.

Transportation System
Main roads: 15 m wide; internal roads: 10 m wide, designed to withstand H30 load capacity.

Investment-Attracting Industries in Dau Giay Industrial Park

  • Mechanical engineering;
  • Electricity, electronics, information technology;
  • Pharmaceuticals and chemicals;
  • Textile and garment;
  • Construction materials;
  • Agricultural food processing;
  • Consumer goods manufacturing.

Investment Incentives in Dau Giay Industrial Park
Corporate income tax exemption for the first 2 years and a 50% reduction for the following 4 years.

Construction Density: 70%
Maximum Building Height: 3 floors
Land Use Coefficient: 2.1 times

Land Lease Price and Other Fees in Dau Giay Industrial Park

  • Infrastructure rental: 160 USD/m² (excluding VAT)
  • Management fee: 0.5 USD/m²/year (excluding VAT)
  • Wastewater treatment fee: 0.4 USD/m³
  • Water supply fee: 0.4 USD/m³
  • Electricity price: According to EVN regulations

Contact
For partners seeking land for factory development in Dau Giay Industrial Park, Dong Nai Province, please contact:
Hotline: 1900.888.858 | Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

10.9274, 107.1395

Videos of this park

Empty

This park has no videos yet

?