KCNHung Yen
CAU NGIN INDUSTRIAL PARK - HUNG YEN

1 photos
Key facts
- Total area
- 184 ha
- Rent
- Not updated
- Occupancy
- Not updated
- Year established
- 2012
- Investor
- Not updated
- Management unit
- Not updated
Overview
CAU NGIN INDUSTRIAL PARK - HUNG YEN
Address: Phu Duc Commune, Hung Yen Province
Operation period: 2012 - 2062
Area: 184 hectares
Land lease price: 90 USD/m²/lease cycle
Strategic location and regional connectivity
l Cau Ngin Industrial Park is conveniently located next to National Highway 10, connecting Thanh Hoa, Ninh Binh, Nam Dinh, Hai Duong, Hai
Phong, and Quang Ninh.
l About 23 km from Thai Binh City.
l About 120 km from Noi Bai Airport.
l About 50 km from Cat Bi Airport.
l About 100 km from Hanoi.
l About 65 km from Lach Huyen Deep Water Port.
Investment-attracting industries at Cau Ngin Industrial Park
l Mechanical engineering, equipment, and spare parts manufacturing;
l Metallurgy, rolling, and wire-drawing industries;
l High-end building materials manufacturing;
l Agricultural products and food processing;
l Electronics and information technology industries;
l Household goods manufacturing.
Infrastructure at Cau Ngin Industrial Park
Power supply
Electricity is supplied from the national grid by Quynh Phu Power Company, with 22kV power lines connected to each factory's perimeter.
Water supply
A water plant will be built within the industrial park with a capacity of 6,500 m³/day.
Wastewater treatment
The wastewater treatment plant has a capacity of 5,300 m³/day.
Internal road system
l The main road in the industrial park is 35 meters wide, with a roadbed width of 16 meters.
l Branch roads are 28 meters wide, with a roadbed width of 12 meters.
Telecommunications
Telecommunications and internet services are provided by reputable providers such as VNPT, FPT, and Viettel.
Firefighting system
Fire hydrants are installed along the roads at standard distances of 120-150 meters.
Investment incentives at Cau Ngin Industrial Park
Exemption from corporate income tax (CIT) for the first 2 years, and a 50% reduction for the next 4 years after taxable income is generated.
Investment process at Cau Ngin Industrial Park
1. Sign the Memorandum of Understanding for land lease.
2. Complete the Environmental Impact Assessment (EIA) approval process.
3. Register for an Investment Registration Certificate.
4. Obtain a Business Registration Certificate.
5. Sign the official land lease agreement.
6. Apply for a construction permit.
7. Begin construction.
Land lease price and other costs at Cau Ngin Industrial Park
Land lease price: 90 USD/m²/lease cycle
Management fee: 0.5 USD/m²/year
Wastewater treatment fee: 0.4 USD/m³
Water price: 0.5 USD/m³
Electricity price: Based on EVN's rates
All prices and fees exclude VAT and are subject to change. Please contact IIP for the latest information.
Contact:
For partners interested in renting land to set up factories at Cau Ngin Industrial Park, Hung Yen Province, please contact Hotline: 1900.888.858 or Email: [email protected].
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
20.6559, 106.4345
Videos of this park
This park has no videos yet