CCNQuang Tri

CAM TUYEN 2 INDUSTRIAL CLUSTER – QUANG TRI

1 photos

Key facts

Total area
50 ha
Rent
55*
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

CAM TUYEN 2 INDUSTRIAL CLUSTER – QUANG TRI
Address: Cam Duong Commune, Quang Tri Province
Operation Period: 2025 – 2075
Total Area: 50 ha
Land Lease Price: 55 USD/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • About 18 km from Quang Tri City Center
  • About 88 km from Phu Bai Airport
  • About 20 km from Quang Tri Airport
  • About 110 km from Hon La Port
  • About 100 km from My Thuy Seaport
  • About 22 km from Cua Viet Port
  • About 12 km from Dong Ha Railway Station

Infrastructure of Cam Tuyen 2 Industrial Cluster
Power Supply:
Substations and electricity grid with sufficient capacity, suitable for the industries within the cluster.

Water Supply:
Water supply capacity is approximately 5,000 m³/day.

Wastewater Treatment:
Wastewater treatment plant with a capacity of about 3,000 m³/day.

Telecommunications:
Fiber optic system, high-speed internet, and telephone lines are pre-installed. Services provided by major providers such as VNPT, Viettel, and FPT.

Fire Protection System:
Includes internal roads, large water tanks, and basic fire stations.

Investment-Attracting Industries at Cam Tuyen 2 Industrial Cluster

  • Processing of agricultural, forestry, and aquatic products
  • Building materials production
  • Supporting industries and light engineering
  • Garment, footwear, consumer goods manufacturing
  • Clean and environmentally friendly industries

Investment Incentives:
According to legal regulations

Land Lease and Related Costs at Cam Tuyen 2 Industrial Cluster

  • Infrastructure lease price: 55 USD/m² (excluding VAT)
  • Management and infrastructure maintenance fee: 0.5 USD/m²/year (excluding VAT)
  • Wastewater and solid waste treatment fees: Based on provider pricing
  • Telecommunication charges: Based on provider pricing at the time of installation
  • Electricity: Customers sign contracts directly with EVN
  • Clean water: Based on provider pricing

Contact:
For land lease and factory establishment at Cam Tuyen 2 Industrial Cluster, Quang Tri Province, please contact:
Hotline: 1900.888.858 or Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

16.8343, 106.9999

Videos of this park

Empty

This park has no videos yet

?