CCNQuang Tri

CAM HIEU INDUSTRIAL CLUSTER – QUANG TRI

1 photos

Key facts

Total area
70 ha
Rent
60*
Occupancy
0%
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

CAM HIEU INDUSTRIAL CLUSTER – QUANG TRI
Address: Hieu Giang Commune, Quang Tri Province
Operation period: 2010 – 2060
Total area: 70 ha
Land lease price: 60 USD/m² (exclusive of VAT)

Strategic Location and Regional Connectivity

  • About 100 km from Phu Bai Airport
  • About 15 km from Dong Ha Railway Station
  • About 26 km from Cua Viet Port
  • About 45 km from My Thuy Port

Infrastructure of Cam Hieu Industrial Cluster

Power Supply System
A 110/22kV transformer station and medium- and low-voltage power lines are constructed, supplying 22kV electricity to the boundary of each factory.

Water Supply System
The underground water pipeline system ensures stable flow and pressure for production and fire protection.

Wastewater Treatment System
A centralized wastewater treatment plant is built with an appropriate capacity.

Telecommunication System
The underground fiber-optic system provides high-speed Internet, landline telephone services, and ensures seamless communication.

Investment-Attracting Industries

  • Food and beverage production; textile and garment manufacturing
  • Office equipment, computers, electrical and electronic devices
  • Paper and paper products manufacturing
  • Agricultural product processing; animal feed production
  • Fine woodwork, agricultural machinery assembly, automobile repair, motorcycle assembly
  • Recycled products, communication equipment, metal products
  • Logistics and goods warehousing
  • Precast construction materials, timber sawing, construction material production

Investment Incentives
Corporate income tax exemption for the first 4 years and a 50% reduction for the next 9 years.

Construction Density: 60%
Maximum Building Height: 3 floors
Land Use Coefficient: 1.8 times

Land Lease Price and Fees
Infrastructure lease price: 60 USD/m² (exclusive of VAT)
Infrastructure management and maintenance fee: 0.5 USD/m²/year (exclusive of VAT)
Wastewater and solid waste treatment fee: 0.4 USD/m³
Telecommunication charges: According to the telecom provider at installation time
Electricity price: Customers sign directly with EVN
Clean water price: 0.45 USD/m³

Contact
For land lease and factory development at Cam Hieu Industrial Cluster, Quang Tri Province, please contact
Hotline: 1900.888.858
Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

16.7981, 107.0396

Videos of this park

Empty

This park has no videos yet

?