CCNPhu Tho

BAI BA 2 INDUSTRIAL CLUSTER – PHU THO

1 photos

Key facts

Total area
75 ha
Rent
75*
Occupancy
0%
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

BAI BA 2 INDUSTRIAL CLUSTER – PHU THO
Address: Chi Tien Commune, Phu Tho Province
Operation period: 2021 – 2071
Total area: 75 ha
Land lease price: 75 USD/m² (exclusive of VAT)

Strategic Location and Regional Connectivity

  • About 9 km from Phu Tho Town Railway Station
  • About 8 km from IC9 Noi Bai – Lao Cai Expressway Interchange
  • About 81 km from Noi Bai International Airport
  • About 105 km from Hanoi City
  • About 226 km from Hai Phong Port
  • About 195 km from Lao Cai International Border Gate

Infrastructure of Bai Ba 2 Industrial Cluster

Power Supply System
A 110kV transformer station and 22kV power distribution lines are constructed to each land plot.

Water Supply System
The water supply capacity for the entire cluster is approximately 3,000 m³/day.

Wastewater Treatment System
The wastewater treatment station has a capacity of about 1,500 m³/day.

Telecommunication System
The underground fiber-optic system provides high-speed Internet and other telecommunication services.

Fire Prevention and Fighting System
Fire hydrants are arranged along internal roads according to standards, ensuring timely emergency response.

Investment-Attracting Industries

  • Food production and processing
  • Beverage manufacturing
  • Textile production
  • Wood processing and manufacturing of wood, bamboo, rattan products
  • Fabricated metal products manufacturing
  • Production of electronic equipment, computers, and optical products
  • Manufacturing of parts and components for automobiles, motorcycles, and other motor vehicles

Investment Incentives
According to applicable legal regulations.

Construction Density: 60%
Maximum Building Height: 3 floors
Land Use Coefficient: 1.8 times

Land Lease Price and Fees
Infrastructure lease price: 75 USD/m² (exclusive of VAT)
Management fee: 0.5 USD/m²/year (exclusive of VAT)
Water price: 0.4 USD/m³
Wastewater treatment fee: 0.35 USD/m³
Electricity price: According to electricity provider regulations
Telecommunication charges: According to telecom provider regulations

Contact
For land lease and factory development at Bai Ba 2 Industrial Cluster, Phu Tho Province, please contact:
Hotline: 1900.888.858
Email: [email protected]

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

21.4366, 105.1655

Videos of this park

Empty

This park has no videos yet

?