CCNPhu Tho
BAI BA 2 INDUSTRIAL CLUSTER – PHU THO

1 photos
Key facts
- Total area
- 75 ha
- Rent
- 75*
- Occupancy
- 0%
- Year established
- Not updated
- Investor
- Not updated
- Management unit
- Not updated
* The rent unit is not recorded in the data; the figure is shown as the database stores it.
Overview
BAI BA 2 INDUSTRIAL CLUSTER – PHU THO
Address: Chi Tien Commune, Phu Tho Province
Operation period: 2021 – 2071
Total area: 75 ha
Land lease price: 75 USD/m² (exclusive of VAT)
Strategic Location and Regional Connectivity
- About 9 km from Phu Tho Town Railway Station
- About 8 km from IC9 Noi Bai – Lao Cai Expressway Interchange
- About 81 km from Noi Bai International Airport
- About 105 km from Hanoi City
- About 226 km from Hai Phong Port
- About 195 km from Lao Cai International Border Gate
Infrastructure of Bai Ba 2 Industrial Cluster
Power Supply System
A 110kV transformer station and 22kV power distribution lines are constructed to each land plot.
Water Supply System
The water supply capacity for the entire cluster is approximately 3,000 m³/day.
Wastewater Treatment System
The wastewater treatment station has a capacity of about 1,500 m³/day.
Telecommunication System
The underground fiber-optic system provides high-speed Internet and other telecommunication services.
Fire Prevention and Fighting System
Fire hydrants are arranged along internal roads according to standards, ensuring timely emergency response.
Investment-Attracting Industries
- Food production and processing
- Beverage manufacturing
- Textile production
- Wood processing and manufacturing of wood, bamboo, rattan products
- Fabricated metal products manufacturing
- Production of electronic equipment, computers, and optical products
- Manufacturing of parts and components for automobiles, motorcycles, and other motor vehicles
Investment Incentives
According to applicable legal regulations.
Construction Density: 60%
Maximum Building Height: 3 floors
Land Use Coefficient: 1.8 times
Land Lease Price and Fees
Infrastructure lease price: 75 USD/m² (exclusive of VAT)
Management fee: 0.5 USD/m²/year (exclusive of VAT)
Water price: 0.4 USD/m³
Wastewater treatment fee: 0.35 USD/m³
Electricity price: According to electricity provider regulations
Telecommunication charges: According to telecom provider regulations
Contact
For land lease and factory development at Bai Ba 2 Industrial Cluster, Phu Tho Province, please contact:
Hotline: 1900.888.858
Email: [email protected]
Location
Industrial Growth:Highly DevelopedDevelopingUnderdeveloped
21.4366, 105.1655
Videos of this park
This park has no videos yet