KCNDong Nai

BAC DONG PHU INDUSTRIAL PARK PHASE 2 - DONG NAI

1 photos

Key facts

Total area
317 ha
Rent
80*
Occupancy
Not updated
Year established
Not updated
Investor
Not updated
Management unit
Not updated

* The rent unit is not recorded in the data; the figure is shown as the database stores it.

Overview

BAC DONG PHU INDUSTRIAL PARK PHASE 2 - DONG NAI 
Address: Tan Phu Commune, Binh Phuoc Ward, Dong Nai Province 
Operation period: 2009 - 2059
Total area: 317 ha
Land rental price: USD 80/m² (excluding VAT)

Strategic Location and Regional Connectivity

  • About 90 km from Ho Chi Minh City center
  • About 8 km from the center of Binh Phuoc Province
  • About 98 km from Tan Son Nhat Airport
  • About 75 km from Song Than Port
  • About 93 km from Saigon Port
  • About 7 km from Dong Xoai Town

Infrastructure of Bac Dong Phu Industrial Park Phase 2

Electricity Supply System

  • Connected to the medium-voltage grid via DT741; an intermediate transformer station (110/22kV) will be built in later phases.

Water Supply System

  • A centralized water supply plant with a capacity of 15,000 m³/day-night ensures stable and high-quality water supply to all factories in the industrial park.

Wastewater Treatment System

  • A wastewater treatment plant with a capacity of approximately 12,000 m³/day-night.

Fire Protection System

  • Fire hydrants are installed along roads and at intersections, with an average distance of 150 meters between hydrants. Each factory is equipped with fire extinguishers and fire alarm systems. Security teams are on duty 24/7 to respond quickly to emergencies.

Telecommunication System

  • Planned to connect to the main exchanges of Dong Phu District or Dong Xoai Town to meet communication needs within the area.

Industries Attracted to Bac Dong Phu Industrial Park Phase 2

  • Processing industries
  • Supporting industries
  • Building materials manufacturing
  • Consumer goods production
  • High-tech industries
  • Electrical and electronic equipment manufacturing

Investment Incentives at Bac Dong Phu Industrial Park Phase 2

  • Corporate income tax exemption for the first 2 years and a 50% reduction in tax payable for the next 4 years.

Land Rental Rates and Other Fees at Bac Dong Phu Industrial Park Phase 2

  • Infrastructure rental price: USD 80/m²/lease cycle (excluding VAT)
  • Management fee: USD 0.5/m²/year (excluding VAT)
  • Wastewater treatment fee: USD 0.4/m³
  • Water price: USD 0.4/m³
  • Electricity price: USD 0.03 - 0.1/kWh

Contact Information:
For partners interested in leasing land to set up production facilities in Bac Dong Phu Industrial Park Phase 2, Dong Nai Province, please contact the hotline: 1900.888.858 or email: [email protected].  

Location

Industrial Growth:Highly DevelopedDevelopingUnderdeveloped

11.4811, 106.8890

Videos of this park

Empty

This park has no videos yet

?